Call Us 800.362.8774 Call Us 866-294-5847 Contact Training Training Training WeatherTRAK Login WaterCompass Login AppManager Login

Knowledgebase

    Setting Up Mainline Delay

    PipeView: Hydraulic Settings

    PDF es:

    1.  In PipeView position the hydraulic system diagram so you can see the mainline that you want to work with (refer to Using PipeView).

    2.  Click the mainline that you want to work with. The slide-out pane displays.

    3.  Click Details in the lower-right. The mainline details display.

    4.  Click Edit in the lower-right corner. The mainline details are available for editing.

    5.  If necessary, click the Mainline and Zone Delays header to expand the section.

    6.  In the Type of Delay field, click Timed or Pressure to indicate how you want the delays to be monitored.

    7.  In the Delay fields, set the number of minutes to wait or the amount of pressure to achieve before the zone will run.

    8.  In the Number of Zones field, click the up or down arrow to set the maximum number of zones to be turned on at a time when the delay is active.

    9.  Click Save in the lower-right corner.