Call Us 800.362.8774 Call Us 866-294-5847 Contact Training Training Training WeatherTRAK Login WaterCompass Login AppManager Login

Knowledgebase

    FM300 Installation Guide .25" - 2" (LC+ & FD-Q)

    Learn how to properly install the FM300 with a .25" to 2" FD-Q Sensor and LC+ Data Collector.

    PDF

    Introduction

    This document covers installation for the WC-FM300-US Ultrasonic Flow Monitor for pipe sizes of 1/4 - 2”.

     

    The WaterCompass FM300 Ultrasonic Flow Monitor is a clamp-on flow monitor with a 30 V power supply that connects to the WaterCompass Data Collector.

     

    The monitor sends real-time flow data to the WaterCompass Data Collector that is viewed from the WaterCompass dashboard. Hourly summation of flow data is stored for analysis and reporting.

     

    Contact Information:

    WaterCompass 707-285-3250

    proservices@hydropoint.com

     

    Before you begin, review the safety precautions at the end of this installation guide.

     

    Pre-Configured Settings

    To ensure accuracy, the Flow Moniotor will be pre-configured with the following settings:

    • Pipe size (varies)
    • Pipe type (varies)
    • Flow direction (right)
    • K-value (60.1)
     
     

    Materials Provided

    • WaterCompass Data Collector (LC+)
    • WaterCompass Flow Monitor
    • 50' of multi-conductor (3+) shielded plenum rated 18 AWG cable
    • 4 wire nutes
    • 4 Data Collector mounting screws
    • Barrel connector
     
     

    Equipment Needed

    • Philips head screwdriver with long shaft
    • Torx screwdriver (for pipes larger than 2")
    • Lock Nut
    • Zip Ties
    • J-box and fittings
     
     

    Installation Overview

     
     

    Phase 1: Data Collector Installation

    Step 1: Mount the WaterCompass Data Collector

     
     

    Step 2: Connect the Data Collector to AC Power

     
     

    Step 3: Verify Data Collector is Online & Activated

     
     

    Phase 2: Flow Monitor Installation 

    Step 4: Choose a Location to Install the Flow Monitor

     
     

    Step 5: Attach the Flow Monitor to the Pipe

     
     

    Step 6: Connect Flow Monitor Sensor Wires to the DC

     
     

    Phase 3: Flow Validation 

    Step 7: Validate Proper Flow Stability 

     
     

    Step 8: Validate Flow on the Data Collector

     

     

     
     

    Appendix

    Appendix A: Selecting an Installation Location 

     
     

     

     

     

     

     

     

     

     

     

     


     

    STEP 7