Assigning a station to a pump start is done in the FLOW menu.
1. Press the FLOW button.
2. Press the à button until the SELECT FLOW OPTION screen displays.
3. Press the à button to advance to Flow 02-01 screen.
4. Press the à button until PS1 is underlined.
5. Press the + or – button to assign a station number to the pump start.