⚠️
Security Notice: Helpjuice, the host of the HydroPoint KnowledgeBase was briefly affected by a third-party security incident between Aug 11, 22:26 UTC and Aug 12, 11:04 UTC. If you visited during that window and were prompted to run a "verification command," please
read this article and take action.
Hydrometers with Incorporated Flow & Master Valve biCoders
BL-BHM Series BiCoders
PDF
Installation Instructions

- Power off the two-wire when installing any two-wire device. Leave 24 to 36 inches of slack in the two-wire at the connection point to allow for easy installation and maintenance.
- Follow the instructions in the Netafim installation manual: Operation, Installation & Maintenance Guide
- Follow the instructions in the controller’s user manual to configure each device (ex: normally open vs normally closed master valves have different configurations) instructed in the controller’s user manual.
- Connect the red and black wires from the flow biCoders to the corresponding red and black wires from the two-wire path. Make certain to maintain polarity. All two-wire connections must have 3M™ DBR/Y-6 or equivalent moisture-resistant connectors.
K-Value and Offset Table for Each Model
Principle Splicing Techniques