The BaseStation 3200 irrigation controller tracks all actions such as programming changes, water times, moisture levels, and other internal actions that occur on the controller. These actions are recorded in an event file on the controller. Event files are useful in determining what happened in the past to help troubleshoot and clarify behavior that is not understood.
Below is an explanation of the abbreviations used for the event files.
Category Abbreviations
Abbreviation |
Word |
AL |
Alarm |
AN |
Pressure Decoder |
BM |
BaseManager |
CP |
Control Point |
ET |
Evapotranspiration |
FM |
Flow Monitor |
FS |
Flow Sensor |
IO |
IOT Servier |
ML |
Mainline |
MS |
Moisture Sensor |
MV |
Master Valve |
NM |
Cloud Network Module |
NT |
Ethernet |
PG |
Program |
PM |
Pump |
PS |
Pump Station |
RG |
Rain Guage Decoder |
SS |
SubStation |
SW |
Event Switch |
SY |
System |
TS |
Temperature Sensor |
TW |
Two-Wire |
WS |
Water Source |
ZP |
Primary Zone |
ZN |
Zone |
Sub-Category Abbreviations
Abbreviation |
Word |
AD |
ET Adjustment |
BK |
Backup |
BT |
Boot up |
CA |
Clear All |
CB |
Calibration |
CC |
Configuration Change |
CL |
Clear |
CN |
Connect |
DC |
Disconnect |
DN |
Done |
DR |
Drop |
DS |
Disable |
DT |
Date/Time |
ER |
Error |
FV |
Flow Variance |
HF |
High Flow |
HR |
Hourly Data |
LF |
Learn Flow |
LP |
Low Pressure |
LR |
Learn Flow Results |
MR |
Manual Run |
OF |
Off |
PA |
Pause |
RD |
Reading |
RS |
Restore |
RN |
Run |
RL |
Run List |
RX |
Receive |
SB |
Subtract |
SE |
Set |
SK |
Skipped |
SO |
Soak |
SR |
Start |
ST |
Status |
SP |
Stop |
TF |
Traffic |
TT |
Transmit |
TX |
Text |
UD |
Update |
VT |
Variance Test |
WA |
Wait |
WT |
Water |
Who or Actor Abbreviations
Abbreviation |
Word |
AD |
Administrator |
BL |
Baseline Commander |
BM |
BaseManager |
CM |
Cloud Network Module |
CP |
Control Point |
DL |
Dial |
DT |
Date/Time |
ED |
Event Date |
ET |
Ethernet |
FJ |
Flow Jumper |
FM |
Flow Meter |
FS |
FlowStation |
IO |
IOT Server |
ML |
Mainline |
MS |
Moisture Sensor |
MV |
Master Valve |
NT |
Network |
OP |
Operator |
PG |
Program |
PJ |
Pause Jumper |
PP |
Program Priority |
PR |
Programmer |
PS |
Pressure Sensor |
PZ |
Primary Zone |
RA |
Rain Shutdown |
RG |
Rain Gauge |
RJ |
Rain Jumper |
SB |
SubStation |
SW |
Event Switch |
SY |
System |
TE |
Test Engine |
TS |
Temperature Sensor |
US |
User |
WS |
Weather Station |
WW |
Water Window |
ZN |
Zone |